The-Myanmar -Hospital

The need to build a new hospital for the increasing of the population, so a new hospital was built with the first floor area covers 2600m2, second floor 1180m2.

BIM Solutions, BIM Services, Architectural – BIM, Architectural – drafting, Structural – BIM, Structural -Drafting, MEP - BIM, MEP drafting, AutoCAD services, Dựng Mô Hình Kiến Trúc 3D – BIM, Chuyển Đổi Bản Vẽ Kiến Trúc Sang Định Dạng CAD, Dựng Mô Hình Kết Cấu 3D – BIM, Chuyển Đổi Bản Vẽ Kết Cấu Sang Định Dạng CAD, Dựng Mô Hình MEP - BIM, Chuyển Đổi Bản Vẽ MEP Sang Định Dạng CAD, Dịch Vụ AutoCAD

BackToTop
"We always put the quality above all else"

The Myanmar Trading Center

Description:

A new trading center in Yangon - Myanmar was built with the first floor area covers 2600m2, second floor 1180m2.

Scope of Work:

BIM SOLUTIONS VIET NAM was responsible for building a 3D architectural model from the hand-drawn designs, we also provided MEP – BIM service for the entire building, extracted the drawings from 3D model for installation.

 


other projects

Apartment Building
The project, located in Europe, which is built to provide flats for the local people around that area, to replace the old one. The project covers an ...
see more