Description: HSBC Tower with 33 stories located in Malaysia. Scope of Work: Beam team provided Pointclouds to BIM services for MEP work, We adjust existing MEP model following scan data (pointclouds) to provide our client accurate as built model.
Description: City View Plaza, located in USA, It is a great project that our team have done. Scope of Work: Beam team provided 3D BIM model, walkthrough for Architectural, Structural and also the site work from 2D drawings, the conversion was completed in under 2 months with client’s satisfaction.
Description: The challenge required the conversion of LiDAR point clouds to LOD350 BIM models for the old building. Scope of Work: Beam team provided Pointclouds to BIM services for the project with Architectural, Structural and Site work with LOD 300/350 and the conversion was completed in under 4 weeks in accordance to Client’s Standard BIM …
Hotel_ ReConstructing Read More »
Description: Location: Hong Kong International Airport Scope of Work: BIM Team was responsible for “Enhancement Services for BIM Model of Midfield Concourse at the Hong Kong International Airport”.
Description: The Talbot Dam was originally constructed in 1905 and located in Toronto, Canada. Scope of Work: The Talbot Dam was originally constructed in 1905 and has only undergone one minor rehabilitation since then. Engineering investigations as a part of this program of work determined that the dam required replacement. Construction work toward the dam’s …
Talbot Dam Rehabilitation Read More »
Description: Address: 430 S San Rafael Ave Pasadena, CA 91105, USA. Scope of Work: The building was built in 1917 with Ozalid drawings, and were stored over one century, we were asked to convert those drawings to AutoCAD format for the purpose of renovation.
Description: Longmore House (Historic Environment Scotland), Salisbury Pl, Edinburgh EH9 1SH, United Kingdom. Scope of Work: Beam team provided Pointclouds to BIM services for the project with Architectural, Structural and MEP. – LOD 300 for newer parts. – LOD 350 for Original building. “Dealing with heritage buildings is never easy”.
Description: The factory is located in US. Scope of Work: Beam team provided Pointclouds to BIM services for this project. – LOD 300: MEP (Pipes, Conduits, Pulleys, Bearings, Shafts, Stringers, idlers…). – LOD 350 Structural.
Description: Vietnamese-German Library is located in Binh Duong Province, a part of Vietnamese-German University. The scale of construction includes 4 stories and total floor area of the project is approximately 8,000 square meters. Scope of Work: Interior design support, 3D modeling, rendering pictures and 2D documents for construction.
Description: Marie Curie hotels is located in Ho Chi Minh City. The scale of construction includes 11 – 14 story towers, 3 basements for parking. The total floor area of the project is approximately 31,227 square meters. Scope of Work: We provided full BIM for Architecture, Structure and MEPF.
Description: Located at 59 Ngo Tat To street, 21 ward, Binh Thanh district, HCMC. The project contains 6 elip shape towers with floor area 22.889 m2 and GFA 126.869 m2. Scope of Work: BIM SOLUTIONS VIET NAM was responsible for building a Structural – BIM model from the design for coordination, clash check. After model …
City Garden Read More »